Targeting Computer Facility
Industrial-scale production using precision optics and quantum control cores to achieve tighter tolerances in fire control systems. The facility processes vastly more sensor arrays and processing cores through dedicated calibration chambers.
productionTier 3 of 4targeting_computer_facility
Stats
CategoryProduction
Level3
Build Cost3,655,000 cr
Build Time240 ticks
Labor Cost32
Always OnNo
Power Draw4
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Fire Control Assembly Line | 384,000 | 120 | 9 | 1 | 1 | 5 |
| L2 | Targeting Computer Plant | 1,101,000 | 180 | 18 | 2 | 1 | 6 |
| L3 | Targeting Computer Facilitythis tier | 3,655,000 | 240 | 32 | 4 | 1 | 7 |
| L4 | Targeting Computer Hub | 10,686,000 | 300 | 45 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.