Targeting Computer Plant
This expanded facility increases throughput by distributing assembly across multiple parallel stations, with enhanced structural framing to support higher component throughput and more quantum control cores for precision targeting alignment.
productionTier 2 of 4targeting_computer_plant
Stats
CategoryProduction
Level2
Build Cost1,101,000 cr
Build Time180 ticks
Labor Cost18
Always OnNo
Power Draw2
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Fire Control Assembly Line | 384,000 | 120 | 9 | 1 | 1 | 5 |
| L2 | Targeting Computer Plantthis tier | 1,101,000 | 180 | 18 | 2 | 1 | 6 |
| L3 | Targeting Computer Facility | 3,655,000 | 240 | 32 | 4 | 1 | 7 |
| L4 | Targeting Computer Hub | 10,686,000 | 300 | 45 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.