Targeting Computer Hub
A state-of-the-art facility running continuous fully-automated production with reinforced frames supporting extreme component density. Quantum control cores and precision optics work in concert to deliver targeting computers at maximum throughput with zero tolerance drift.
productionTier 4 of 4targeting_computer_hub
Stats
CategoryProduction
Level4
Build Cost10,686,000 cr
Build Time300 ticks
Labor Cost45
Always OnNo
Power Draw6
Life Support Draw1
Build Materials
Produces
Upgrade Chain (4 tiers)
| Tier | Facility | Build Cost | Build Time | Labor | Power | Life Sup. | Materials |
|---|---|---|---|---|---|---|---|
| L1 | Fire Control Assembly Line | 384,000 | 120 | 9 | 1 | 1 | 5 |
| L2 | Targeting Computer Plant | 1,101,000 | 180 | 18 | 2 | 1 | 6 |
| L3 | Targeting Computer Facility | 3,655,000 | 240 | 32 | 4 | 1 | 7 |
| L4 | Targeting Computer Hubthis tier | 10,686,000 | 300 | 45 | 6 | 1 | 7 |
Each tier is built by upgrading the one below it. Cost, build time and power draw climb with the tier; the recipe it runs stays the same.